Civil

UCONN Stadium at Rentschler Field

Ellerbe Becket selected DTC from the top mechanical, electrical, plumbing engineers in the state to help design the $79 million, 180,000 sq. ft., 40,000-seat stadium at Rentschler Field for the University of Connecticut.

DTC and AECOM (formerly Ellerbe Becket) coordinated closely with UConn’s Athletic Director and University staff to provide a state of the art stadium […]

Comments Off on UCONN Stadium at Rentschler Field

Dunkin Donuts Park Baseball Stadium

The City of Hartford and Centerplan Development are currently partnered to create a $360M+ development in the area of Hartford referred to as Downtown North (DoNo). The centerpiece to this development is a new baseball stadium to be named Dunkin Donuts Park, which will house the “AA” minor league baseball team nicknamed the Yard Goats. DTC’s […]

Comments Off on Dunkin Donuts Park Baseball Stadium

Fairchild Wheeler Interdistrict Magnet Campus wins 2016 MacConnell Award

DTC is proud to have been the engineer of record for the award-winning Fairchild Wheeler Interdistrict Magnet Campus. The project, led by JCJ Architecture, supporting Bridgeport Public Schools was awarded the 2016 James D. MacConnell Award by the Association for Learning Environments.

Comments Off on Fairchild Wheeler Interdistrict Magnet Campus wins 2016 MacConnell Award

North Haven Middle School Renovations and Additions

The original North Haven Middle School was constructed in 1960 and encompassed approximately 140,000 square feet. The school functioned continuously without any major renovations or updates since the time it was built, and was eventually deemed “out of date and minimally adequate for a 21st century middle school,” according to a New England Association of […]

Comments Off on North Haven Middle School Renovations and Additions

Niantic River Railroad Bridge Replacement

Hydraulic/Scour Analysis

DTC was responsible for hydraulic sizing and scour assessment for this major movable span bridge replacement project, directly on Niantic Bay. Hydraulic sizing considered both inland and tidal flooding events through the 500 year level. Scour assessment was performed utilizing HEC-18 and included analysis for a wide range of inland and tidal flooding events […]

Comments Off on Niantic River Railroad Bridge Replacement

Whole Center Renovations to Navy Operations Support Center (NOSC)

DTC completed the $3 million renovation of interior and exterior elements of Naval Operational Support Center in Raleigh, NC.

The NOSC mission is to provide mission capable units and individuals to the Navy and Marine Corps team throughout the full range of operations — from peace to war. It provides administrative, medical and readiness support to […]

Comments Off on Whole Center Renovations to Navy Operations Support Center (NOSC)

Marine Corps Base Camp Lejeune

As the Prime Design-Build Contractor for the Naval Facilities Engineering Command, Mid-Atlantic (NAVFAC-MIDLANT), DTC completed the design-build task order for the new construction of ammunition bunkers at Marine Corps Base, Camp Lejeune, North Carolina under a MACC with the North Carolina IPT.

The project consisted of the design and construction of (4) open bay, reinforced concrete […]

Comments Off on Marine Corps Base Camp Lejeune

U.S. Armed Forces Reserve Center (AFRC) Fort Buchanan

DTC and CR architecture + design was awarded the design and construction of the $21 million US Armed Forces Reserve Center (AFRC) at Fort Buchanan, Puerto Rico.

The Vehicle Maintenance Shop (VMS) included electrical class 1 div 1 hazardous spaces consisting of explosion proof lighting, outlets and associated code compliant raceway and wiring.  The VMS also […]

Comments Off on U.S. Armed Forces Reserve Center (AFRC) Fort Buchanan

U.S. Armed Forces Reserve Center (AFRC) Fort Mayaguez

DTC and CR architecture + design was awarded the design and construction of the $19 million US Armed Forces Reserve Center (AFRC) in Mayaguez, Puerto Rico.

The Vehicle Maintenance Shop (VMS) included electrical class 1 div 1 hazardous spaces consisting of explosion proof lighting, outlets and associated code compliant raceway and wiring.  The VMS also included […]

Comments Off on U.S. Armed Forces Reserve Center (AFRC) Fort Mayaguez

Hurricane Repairs Waterfront Facilities

DTC was awarded the design-build repairs/reconstruction of marina facilities on Boca Chica Key and Sigsbee Park – part of the Naval Air Station Key West, Florida – that were damaged by Hurricane Wilma.

The new waterfront structure systems included all sheet pile walls, quay walls, wharves, floating piers, gangways, mooring piles & dolphins and all other […]

Comments Off on Hurricane Repairs Waterfront Facilities