 |

 |

|
 |

 |

 |
Camp Rell East Lyme, CT
Among the numerous assignments as a combined contract for the Connecticut Department of Public Works and the Connecticut National Guard for Camp Rell, DTC was responsible for providing field survey, site design, and mechanical and electrical engineering services in support of the planning, design and construction administration of a 13,500 SF, 52-unit Quarters.
A large pumping station and trunk sewer was planned, designed and constructed and DTC. In addition, DTC was selected to design the connection of the entire Camp Rell training facility to the East Lyme municipal sewer system.
|
|
 |
|