Ralph Walker Rink, New Haven, CT
UCONN Stadium at Rentschler Field
Ellerbe Becket selected DTC from the top mechanical, electrical, plumbing engineers in the state to help design the $79 million, 180,000 sq. ft., 40,000-seat stadium at Rentschler Field for the University of Connecticut.
DTC and AECOM (formerly Ellerbe Becket) coordinated closely with UConn’s Athletic Director and University staff to provide a state of the art stadium […]
Dunkin Donuts Park Baseball Stadium
The City of Hartford and Centerplan Development are currently partnered to create a $360M+ development in the area of Hartford referred to as Downtown North (DoNo). The centerpiece to this development is a new baseball stadium to be named Dunkin Donuts Park, which will house the “AA” minor league baseball team nicknamed the Yard Goats. DTC’s […]
Connecticut Convention Center Adriaens Landing
One of the largest public and private spending packages ever launched in Connecticut encompasses a mixed use program of convention center, hotel, residential, shopping and support attractions on the Connecticut River.
DTC served with BVH’s engineers in a unique consortium to address the fast track project schedule being managed by TVS Architects for the State Office […]
Municipal Aquatic Center
DTC provided engineering design services for a new Municipal Aquatic Center in Harrison, New York.
This facility included two pools, a 7,900 sq ft main pool with a maximum capacity of 491 bathers and a 779 square foot wading pool with a maximum capacity of 49 bathers. The Bath House totaled 5,300 square feet and included […]
Renovations to Secured Compartmentalized Information Facility (SCIF), Armed Forces Reserve Center, Orlando
DTC provided renovations and modernizations with code updates to the Secure Operations Center at the First Lieutenant David R. Wilson Armed Forces Reserve Center, Orlando, FL. The main work was the installation of mechanical and electrical upgrades for operating SCIF. DTC customized the coils and condensers, installed split system air conditioning equipment, modified air distribution […]
Rogers Inter-District K-8 Magnet School Ext. Stamford, CT
DTC is providing structural engineering services for all four phases of the Rogers Inter-District K-8 Magnet School extension.
The project involves creating an auxiliary campus on Strawberry Hill Avenue, Stamford CT at the former Sacred Heart Academy site. The auxiliary campus will be an extension of the very successful Rogers Inter-District K-8 Magnet School. Phase I and […]
North Haven Middle School Renovations and Additions
The original North Haven Middle School was constructed in 1960 and encompassed approximately 140,000 square feet. The school functioned continuously without any major renovations or updates since the time it was built, and was eventually deemed “out of date and minimally adequate for a 21st century middle school,” according to a New England Association of […]
Niantic River Railroad Bridge Replacement
Hydraulic/Scour Analysis
DTC was responsible for hydraulic sizing and scour assessment for this major movable span bridge replacement project, directly on Niantic Bay. Hydraulic sizing considered both inland and tidal flooding events through the 500 year level. Scour assessment was performed utilizing HEC-18 and included analysis for a wide range of inland and tidal flooding events […]