Slater Hill Bridge Replacement |
|
|
|
|
Location: Killingly, CT
|
|
Tuesday, 20 July 2010 |
DTC was contracted by the Town of Killingly to design a bridge replacement for a single span bridge over Slater Brook. The existing bridge was closed after an inspection revealed undermining and failure of one of the abutments. The newly constructed bridge consists of a precast arch spanning 12 feet over Slater Brook along with 20 foot high wing walls. DTC was also responsible for performing the hydraulic analysis and obtaining all permits required as part of the State’s Local Bridge Program.
|