Mechanical, Electrical, Plumbing and Fire Protection

//Mechanical, Electrical, Plumbing and Fire Protection

Greenwich Public Safety Complex

DTC initially provided site selection services in association with the feasibility analysis and site selection of a new public safety facility in downtown Greenwich.

The project presented the challenge of designating an appropriate building site with the tight confines and limited space availability in Downtown Greenwich. DTC provided the owner several alternatives, taking into account municipal, […]

Comments Off on Greenwich Public Safety Complex

CTANG Facility Vision 2020 Projects

DTC was selected with Ames & Whitaker Architects to provide engineering and architectural services for various military projects to be designed and built between 2012 and 2020 for the Connecticut Department of Construction Services.

Fifteen project sites have been identified by the military, including armories, maintenance facilities, simulators and campus upgrades. Assignments will be given on […]

Comments Off on CTANG Facility Vision 2020 Projects

New Readiness Facility, Camp Niantic

DTC provided all engineering design and permitting services for the new Camp Niantic Readiness Center for the Connecticut Army National Guard.

The facility was designed to support law enforcement/legal support personnel, as well as Chemical Battalion personnel and vehicles.

The Readiness Center is 50,201 sq. ft. with 56,340 sq. ft. of new paving. The site for the […]

Comments Off on New Readiness Facility, Camp Niantic

New Sector Command Building U.S. Coast Guard

Design/Build State-of-the-Art New Sector Command Headquarters. DTC provided civil, structural, mechanical, electrical, plumbing and fire protection engineering, subsequent construction administration task for each discipline throughout construction and construction management/general contracting services for the U.S. Coast Guard’s Facilities Design & Construction Center, Atlantic (FD&CC LANT) on the design-build delivery of a new Sector Command Building in […]

Comments Off on New Sector Command Building U.S. Coast Guard

United States Coast Guard Multi-Mission Building

DTC was selected as the prime design-build contractor in conjunction with CR Architecture + Design for an $8.6 million contract for the design and construction of a new Multi-Mission Building at USCG Sector Field Office (SFO) Galveston, TX.

DTC provided all engineering, construction management, general contracting, supervision, quality control and safety. The team designed and built […]

Comments Off on United States Coast Guard Multi-Mission Building

Army Reserve Equipment Concentration Site (ECS)

DTC was awarded the design and construction of the $24 million Army Reserve Equipment Concentration Site (ECS) located at Lakehurst, New Jersey.

This design/build project included new fire alarm and mass notification systems design as part of the design of a new Vehicle Maintenance Facility and a Warehouse that complements the buildings of the existing base […]

Comments Off on Army Reserve Equipment Concentration Site (ECS)

Walmart Stores Rooftop PV Systems

DTC performed full design and construction administration services for over 3 Megawatts of rooftop PV systems on multiple Walmart buildings throughout Connecticut.

Initially, DTC performed structural evaluations of the buildings to ensure adequacy for the ballasted PV systems. This required coordination with both the local building inspectors and Walmart corporate personnel. After this was confirmed, DTC […]

Comments Off on Walmart Stores Rooftop PV Systems

Target Stores Rooftop PV Systems

DTC performed full design and construction administration services for approximately 20 Megawatts of rooftop PV systems on multiple Target buildings throughout Connecticut, New York and New Jersey.

Initially, DTC performed structural evaluations of the buildings to ensure adequacy for the ballasted PV systems. This required coordination with both the local building inspectors and Target corporate personnel. […]

Comments Off on Target Stores Rooftop PV Systems

Two West Hartford High Schools Field Lighting

The Town of West Hartford selected DTC to provide landscape architectural, civil and electrical engineering services for the creation of design documents for the implementation of athletic field lighting at Conard and Hall High Schools.

DTC met with town officials and parent organizations to develop plans suitable for permitting and construction of light poles for athletic […]

Comments Off on Two West Hartford High Schools Field Lighting

University of Connecticut On-Call

DTC is currently providing mechanical, electrical and plumbing design services for multiple assignments as part of an on-call contract with the University of Connecticut.

Some of the assignments include the following:

Bishop Center Mechanical System – Long Term Improvements – HVAC Upgrades

DTC prepared an HVAC facilities existing condition analysis with detailed recommendations related to long term improvements […]

Comments Off on University of Connecticut On-Call