Energy

//Energy

Focus on Design

At DTC, we were early adopters of the four dimensional building information modeling system, Autodesk Revit, which has become the AEC industry standard. We’ve been using the software since 2008, and have had the opportunity to use it on a multitude of projects – both small and large – as a result.

Our engineers have utilized […]

Comments Off on Focus on Design

Walmart Stores Rooftop PV Systems

DTC performed full design and construction administration services for over 3 Megawatts of rooftop PV systems on multiple Walmart buildings throughout Connecticut.

Initially, DTC performed structural evaluations of the buildings to ensure adequacy for the ballasted PV systems. This required coordination with both the local building inspectors and Walmart corporate personnel. After this was confirmed, DTC […]

Comments Off on Walmart Stores Rooftop PV Systems

Target Stores Rooftop PV Systems

DTC performed full design and construction administration services for approximately 20 Megawatts of rooftop PV systems on multiple Target buildings throughout Connecticut, New York and New Jersey.

Initially, DTC performed structural evaluations of the buildings to ensure adequacy for the ballasted PV systems. This required coordination with both the local building inspectors and Target corporate personnel. […]

Comments Off on Target Stores Rooftop PV Systems

New Opportunities Inc. ARRA Senior Housing Energy Upgrades

DTC worked with New Opportunities Inc., the Community Action Agency operating the ARRA Weatherization program. New Opportunities Inc. (NOI) is under contract with the CT Department of Social Services for the purchase and installation of ductless heat pumps for state financed elderly and disabled housing projects throughout the state of Connecticut.

The project was funded by […]

Comments Off on New Opportunities Inc. ARRA Senior Housing Energy Upgrades

Fairchild Wheeler Interdistrict Magnet Campus

The City of Bridgeport School Building Committee selected DTC and JCJ Architecture to provide architectural and engineering services for the planning, design and construction administration of the new Multi-Magnet High School.

The new school is a 9th to 12th grade inter-district high school. The capacity of the school is 1500 students housed in 3 – 500 student […]

Comments Off on Fairchild Wheeler Interdistrict Magnet Campus